Tall Ship Soren Larsen ~ South Pacific Sail Training Adventure for all ages
  

See Previous 2004 Voyage Logs

Dry Dock 2005 - Tauranga

The ship is hauled up the slipway at Sulphur Point for her yearly hull repaint. The hull is waterblasted, scraped by hand, primed and resprayed with fresh antifouling. Past crew is recognise this annual ritual of labour with fond nostalgia...


High water - up she goes.

In the steel cradle.

Blast off!

Just fits in the slipway cover.

Spars ashore

Kenny, fully primed.

Audrey on the chain gang.

Mate Mickel.

Nate on the hull.

Engineer Eddie with Mal.

Hull prep.

Topsides paint.

Hull prep.

Tony caulking

Ulrick with precious pins.

The massive lines of the hull..

Painting on a big canvas.

Nic caulking

Astrid rescaling

Mickel and new chain sections.

Tony caulking by midnight oil.

Astrid/Kenny:days end!

Bow ready to paint.

And the stern.

Rare sight of the prop.

Soren a la Cunard.

Chain, chain, chain..

The airless spray man gets to work.

Two coats of International antifoul.

Ship in a box.

Back in the water.

Tiger -over from OZ to help.

Back in the water.

 

See Pacific Sailing schedule
- here

Square rig adventure for all ages.
Join the star of ‘The Onedin Line’..

 

Home | Voyages | Charters | Ship & Crew | Voyage Log | Track Ship | Book Berth | Contact
Tall Ship Soren Larsen - Squaresail Pacific Ltd. P.O.Box 310 Kumeu Auckland 1250 New Zealand 00 649 411 8755
page updated 21 July, 2004 . © Tallship Soren Larsen