The Great Auckland Refit 2002
Three
months have been set aside from Soren Larsen's sailing
schedule to tackle planned maintenance and another stage
of the ship's restoration process. The Aft end below
decks is to be refurbished - i.e. the navigation area,
Master's, Mate's and Engineer's cabin are being totally
rebuilt.
28th
May 2002 - Images of the last
fortnight: The aft deck waterways are fitted and bolted
down, the deck planks are cut and shaped and being spiked.
The girls have made a wonderful job of the galley brightwork
and the aft end is starting to look quite spectacular..
|
|
|
|
 |
|
 |
| The
course yard off and varnished. |
|
Jarad, Andrew and Dean in our mobile machine shop - the
gull wing container on the wharf. |
|
|
|
 |
|
 |
| Steve
S returns (after a decades away) to help with his shipwright
skills |
|
Marti fitting up deck planks. |
|
|
|
 |
|
 |
| Starboard
side |
|
- and on port. |
|
|
|
 |
|
 |
| Each
plank is individuall pre- shaped - and fitted to their individual
position. |
|
The
outer waterway beams are all bolted down. |
| |
|
|
 |
|
 |
| Daphne
organises space below |
|
Eric
keeping the team going on deck |
| |
|
|
 |
|
 |
| Steve
M finishing fitout, aft |
|
Jeff
carving kauri - also in the aft cabins |
| |
|
|
 |
|
 |
| New
water tank has gone into the starboard head - here Brian
from Kumeu Plumbing fits the pipes. |
|
Generator
returns from being overhauled and waits its turn in the
saloon. |
| |
|
|
 |
|
 |
| Tracy
checks her brushwork... |
|
Glowing
galley varnish. |
| |
|
|
|
++++++
More
refit images will follow here as the work progresses.
Contact our Auckland
HQ:
Phone 00 649 411 8755
Fax 00 649 411 8484
Email : escape%40sorenlarsen%2eco%2enz
Postal address P.O.Box 310 Kumeu
Auckland 1250 New Zealand
|
|
|
Refit
Pictures - Click here for other pages:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|